|
Activities:
2010-02-06. Panel making tutorial added, Download tutorial.pdf file
2010-01-30. “Tape” quad. CTVS/AVTR head made.
2010-01-22. Eagle CAD file and pic for UHF Quad added under QuadRef section
2010-01-20. COMM2 panel “ready”, connected to COMM1 and tested
2010-01-08. INFO For you who download the panels I made from “QuadRef”. Notice that the printout may differ from “true” size when printed. Orginal size of baseplate width of are 5” 3/4 (or 146.05 mm) You may need to adjust for that. There are some other considerations also, check QuadRef heaf for more info.
2010-01-04: UHF Quad, ARC-164. Not the most beautiful work but it will do :-)
2009-12-26: Finally :-) Got the COMM panel interfaced and tested.Pin numbering is a hell when mirrored ROFL . Added some more pics to the COMM panels Quad ref. Merry Christmas to all of you out there
2009-11-03: COMM panel, I/F boards and knobs missing still. Semitransparent film over 7segm digits also await I/F boards.
2009-10-27: ThrustMasters MFD arrived. Fits like a glove. See Instrument panel pics...
2009-10-22: Instrument panel and some others back from cutter finally. Need some polishing before presentable. Added some pics of the EngineInstrument panel under that subsection.
2009-09-16: Been while since last update. Front instrument panel reworked and sent to cutter. PCB made to leftside qauds 7 Segm displays.
2009-06-14: FUEL Quad for leftside inner panel
2009-06-05: KY58 ready (beside the knobs and interface boards :-) Working on COMM panels. .Started on the Fuel panel
2009-05-10: Intercom, Stall, Antenna, LASTE, and TV panel made. Leftmost row of quadrant panelheads (allmost) ready. Knobs, I/O cards etc still missing.
2009-05-07. Emergency Flight Quadrant. Missing Hatswitch
2009-05-05. AUX LGT Quad made. Still remain to be cut to fit lower angle of left side frame (that will take some time before started :-)
2009-04-27. SAS Quad made. Missing PCB
2009-04-25. Baseplates painted, some of lightpanels cut.
2009-04-01. Just fetched a batch of sidepanel baseplates from lasercut
2009-03-31. Added pic of prototype layout of weapon panel.
2009-03-29. Prototype layout for frontpanel instrument gauges panel. To be Air-core based.
2009-03-14. Removed some reference pics that shouldn’t have been there. Sorry for that.
Sent most of side panelheads to be cut. Rework on front panel ongoing. Work on a air-core based engine instrument panel begun
2009-02-07. Caution/warning quad update. Reworking front instrument panel ongoing.
2009-02-04. Front instrument panel checked versus real gauges etc and found “not” perfect”. Start adjusting measurements to fit real world. Added pics from the check (before changes).
2009-01-26. Added CDU panel info.
2009-01-24. Added this frame and updated the link-page
2009-01-23: Added more of right side panel graphics
2009-01-21: Added leftside panel graphics
|